Squares Queensferry Crossing (1)
Queensferry Crossing >
Open
Squares Forth Road Bridge (1)
Forth Road Bridge >
Restricted
Squares Forth Bridge (1)
Forth Bridge >
Open
Squares Queensferry Crossing (1)
Queensferry Crossing
Open
Motorway

Open to general traffic, subject to normal motorway restrictions

Road User Guide
Squares Forth Road Bridge (1)
Forth Road Bridge
Restricted
Footpath/Cycleway Restrictions - WEST FOOTPATH - CLOSED

Due to essential works the West footpath is currently closed. The East footpath/cycleway is open for cyclists and pedestrians.

Access Restrictions
Squares Forth Bridge (1)
Forth Bridge
Open

News from the Forth Bridges

Background image - A056
Forth Road Bridge to Fully Reopen 11pm Saturday
The Forth Road Bridge is to fully reopen tomorrow (Saturday 20 February) at 11pm. HGVs to have 24-hour access.
Discover More
Background image - Hgv Crossing Bridge Pano
HGV Opening Hours Extended on Forth Road Bridge
The phased reintroduction of heavy goods vehicles to the Forth Road Bridge is continuing. The hours during which HGVs can cross the bridge are being extended.
Discover More
Background image - Dsc 0546
HGV Trial to Start on Forth Road Bridge
Limited night-time access to the Forth Road Bridge for HGVs to begin this week.
Discover More
Background image - Forthroadbridge10
New Schematics Show Phase 2 Design
Schematics show the design of additional strengthening works being carried out on the Forth Road Bridge in order to allow HGVs back on the bridge.
Discover More
Background image - Forthroadbridgefromqfc
Forth Road Bridge Given Green Light to Re-Open
The Forth Road Bridge will be open to vehicles except for HGVs from the morning of Wednesday 23 December 2015.
Discover More
Background image - Jointing And Sealing Works On Frb 1 Big Thumb
Proactive Road Improvement Work Taking Place During Bridge Closure
Amey is undertaking a proactive programme of improvement work during the Forth Road Bridge closure. Several schemes planned for 2016 have been accelerated.
Discover More
Background image - Dsc 0329
Solution Design Work Now Complete
In the week since the Forth Road Bridge closed, Amey’s team of engineers have been working to develop a solution to a crack in one of the truss end links.
Discover More
Background image - Dsc 0212
Forth Road Bridge Engineers Show True Grit
Engineers on the Forth Road Bridge have been using gritters to carry out a controlled test to check out structural behaviour on the bridge.
Discover More